I finally teased out how much it cost the Indians to build small Pressurized Heavy Water Reactors. A March 6, 2005 press release from the Indian Department of Atomic Energy stated:
India’s largest and first 540 MWe nuclear power plant (TAPP-4) achieved criticality today morning. . . . The 2x540 MWe Tarapur Atomic Power Project (TAPP-3&4) is adjacent to TAPS – 1&2, the first nuclear power plant to be set up in India. Tarapur, is about 100 kms north of Mumbai. . . . TAPP-3&4 has an approved cost of Rs. 6525 crores, but it is anticipated that the Project would be completed in about Rs.6000 crores. . .,
6000 6000 crores of Rupees is about $1.2 billion. At about 1.1 GW rated output, the cost of the Indian reactors is a little more than a dollar per watt. Smaller Indian 220 MW PHWR probably cost about $260 million per example. These reactors are build without factory manufacture of parts, so Indian PHWR construction costs are nor as low as they could potentially go.

Indian PHWRs burn natural Uranium and do not produce Nuclear waste. Instead they produce fuel for Indian FBRs. The first 500 MW Prototype Indian FBR is slated to go critical in two years will end up costing the Indians Rs.5,000 crores, or about $1 billion, about two dollars a watt. Prototypes often prove to be more expensive than subsequent units, Several unexpected events added to the Indian construction cost. These included the 2004 tsunami. Recovery from the tsunami increased Indian construction costs. Construction costs for an undersea tunnel increased due to unanticipated soil conditions. Subsequent Indian FBRs are expected to cost about 3000 crores per unit or $600 million, about $1.20 per watt of generating capacity. Even at the $2 per wat cost figure for the prototype, the India fast breeder will cost far less that the 22,000 crores to Rs. 46,000 crores $4.4 billion to $9.2 billion) figure forecast by anti nuclear fanatic Arjun Makhijani.

Critics charge that the Indian fast breeder design is not safe. Eventually in a decade the Indians play to begin manufacturing AHWR to be powered by U-233 produced in Indian FBRs.

Meanwhile the Indians are moving forward with plans to expand nuclear production capacity. The Indians anticipate $10 billion in new reactor orders between now and 2012. Indian businesses are now planning to begin exporting the ssmall 220 MW PHWR. i
f they can sell the PHWR to underdeveloped countries at similar cost to those enjoyed byIndian, the Indians should make quite a lot of money.

The Indian nuclear plan although envisioned as long term, has characteristics of an interim nuclear approach. It uses older nuclear technology, manufactured at low cost, and seeks to couple the older technology with a more advanced class of nuclear breeders. Problems with the Indian plan include safety concerns with the Indian sodium cooled fast breeders, and the cost of reprocessing nuclear fuel;. The Indian system is quite complex and involves the use of three distinct reactor technologies as well as two or three reprocessing technologies.
In contrast, the LFTR holds the promise of accomplishing everything the Indian system does with one simple elegant reactor design. Thus the LFTR would promises even lower costs than the now low costs of the Indian nuclear system.

Wednesday, September 9, 2009

The Interim Nuclear Future: An Introduction

I have characterized our present energy situation as the Era of Confusion. The cause of the confusion is a fundamental change in the world's energy economy. That change has two fundamental changes, the first is the probable peaking of world oil production within a few years, if it hasn’t happened already. At present oil plays a nearly indispensable role in the world's economy, and it will be extremely difficult to replace it. Peak production of other fossil fuel energy sources, coal and natural gas, are not expected quite so soon, but neither would be expected to last at a prolonged period at the present rate of consumption. However, the rising atmospheric concentration of the greenhouse gas CO2 raises profound questions about the wisdom of continued fossil fuel use in energy production.

We have known about peak oil for a long time. Scientist began to suspect the climate changing potential of burning fossil fuels about the same time.

The fundamental source of our confusion is the impending end of our established energy order. Humans as a species are not good at collectively and clear sightedly addressing changes in their way of life. The news that change is impending is often greeted with fear and denial. Ideology can contribute to poorly thought out proposed solutions. Rather than collectively seek solutions, people are less inclined to listen than to offer their own solutions, solutions that reflects their own interests and beliefs.

Knowledge is often problematic because of human cognitive capacities are limited. Furthermore our emotional commitments often determine what we believe to be true, rather than the other way around. Thus we may ignore or deny uncomfortable facts that contradict emotionally directed beliefs. Rather than sort our feelings after we make determinations of facts, we often chose what facts to believe because of feelings that may not have any rational basis.

Confusion is a product of dissonance between beliefs and facts. Confusion can be seen in the demand by German Greens and Socialists that nuclear plants be shut down and replaced by CO2 emitting coal fired electrical plants. The scheme of Greenpeace to shut down nuclear plants and replace them with CO2 emitting natural gas fired power plants. The advocacy of CO2 emitting micro-generation technology by nuclear critic Amory Lovins, and the advocacy of CO2 emitting natural gas technology by nuclear critic Joe Romm, who scorns others for their failure to fight global warming.

Defenders of nuclear power have attempted to reason with its Green critics, only to be scorned as shills of the nuclear industry. We have offered fact based answers to their objections, only to see the facts ignored. We have pointed to flaws in their logic, only to see the same thinking errors repeated over and over. Yet these seemingly irrational opponents of nuclear technology insist that they are committed to the fight against climate change. Green enemies of nuclear power present us with incarnate evidence of the confusion of our present era.

Critics of nuclear power are correct are right in one respect, the present nuclear formula cannot replace all CO2 emitting energy technologies. Large, Light Water Reactors require too much time to build, and are more expensive, that would be good for society. But the same critics go on to tout renewables, which also lack the potential for rapid deployment, and are even more than nuclear, while being far less reliable.

The solution to the rapid deployment and cost issues of nuclear is not throwing out the nuclear baby with the LWR technological bath, but to adopt more rapidly scaleable and lower cost nuclear technologies. The Liquid Fluoride Thorium Reactor (LFTR) represents what is by far the best of these technological options, but it still needs a major development program. The rapid development of LFTR technology is highly desirable, not only because the LFTR is highly safe, because it is more efficient than LWRs, will cost far less than renewables, largely solves the problem of nuclear power and indeed of post-carbon energy.

The term interim solution refers to potential or actual nuclear technologies, which can be deployed before the LFTR is ready for large-scale deployment, and which can take advantage of at least some of the scalability features of the LFTR. Such features might include factory production of small reactors, the use of innovative approaches to nuclear sites. Innovative approaches to nuclear finance will also be important.

Successful interim nuclear approaches are likely to come from sponsors with deep pockets. Even with a deep pocket, a well-developed technology is an advantage. Scalability is the name of the game for interim nuclear technology, and a successful interim technology should be feature rapid and mass manufacture, with quick and easy set up of manufactured units.

Long run nuclear solutions will feature low energy cost, mass manufacture and solutions to all of the major problems of nuclear power. I will later discuss the candidates for interim solutions in some depth, but I will conclude this post with a mention of a few small reactor (100 MWe to 400 MWe) candidates what would be quickly available as interim nuclear solutions.

The first surprisingly comes from India. It is the Indian 220 MW PHWR. Although this particular reactor is not mass-produced at present, it is a successful small reactor that could be mass-produced. As such it offers attractive features including the potential for electrical generation in third world countries. The PHWR uses natural uranium, and thus proliferation issues related to uranium enrichment are not matters for concern. Even without factory production the Indian PHWR qualifies as a low cost reactor. The introduction of factory manufacture in India would lower that cost further, creating the probability that PHWRs could be produced in India and China for under $1000 per kW of generating capacity. This would make the Indian PHWR a very attractive candidate for interim nuclear technology. In addition the PHWR could be factory manufactured in a Western Nation - perhaps Canada - at a very competitive price.

Another advantage of the Indian PHWR is that an advanced replacement is already under development. This is the Indian AHWR, a reactor Like the PHWR, the AHWR could be built in Asian factories at a fraction of the price of LWRs in Europe or the United States. Again factory construction of AHWRs in Europe or North America would lower nuclear cost. The AHWR will operate as a thorium breeder, reduce the problem of nuclear waste, and finally the AHWR will feature the most advanced cooling/safety features of any water-cooled reactor. Thus the AHWR represents perhaps the most advanced and attractive form of wholly conventional nuclear technology likely to be available as an interim solution.

Although the Babcock & Wilcox Company (B&W) 125 MW mPower reactor is not as advanced as the AHWR it is a modern conventional LWR design, B&W has obtained the support of the TVA in the development of the mPower reactor, and TVA is likely to be their first customer. It is likely that B&W and TVA will have deep enough pockets to bring the mPower reactor to market.

Advantages of the mPower include:

* Integral nuclear system design

* Passive safety systems

* Underground containment

* Five-year operating cycle between refueling

* Scalable, modular design is flexible for local needs

* Multi-unit (1 to 10+) plant

* Used fuel stored in spent fuel pool for life of the reactor (60 years)

* North American shop-manufactured

Rod Adams has published the best information likely to be available in the near future on mPower costs. The $5000 per kW figure is highly competitive with renewables, given that the mPower reactor would have a capacity factor of .90 and will be able to provide electricity on demand. The $5000 per kW figure is probably very conservative. My own estimate is that the factory manufactured mPower reactor will cost no more that $3500 per kW to install in large numbers, and could quite possibly be mass produced for even less.

These candidate technologies can compete with much larger reactors on features, and potentially blow the large reactors out of the water on price. Given the availability of the technology and deep pockets they should at the very least be classified as promising harbingers of the interim nuclear future.


Followers

Blog Archive

Some neat videos

Nuclear Advocacy Webring
Ring Owner: Nuclear is Our Future Site: Nuclear is Our Future
Free Site Ring from Bravenet Free Site Ring from Bravenet Free Site Ring from Bravenet Free Site Ring from Bravenet Free Site Ring from Bravenet
Get Your Free Web Ring
by Bravenet.com
Dr. Joe Bonometti speaking on thorium/LFTR technology at Georgia Tech David LeBlanc on LFTR/MSR technology Robert Hargraves on AIM High