Google.org is still confused about paths to the energy future

Computer modelers can trip up in two ways. The model may be poorly designed in the first place. Secondly the data input may be flawed. As the old saying goes, "garbage in, garbage out." Models need to be tested, but if your model is designed to predict the future. and you foresee major changes in the future, and you want to predict the outcome of those changes, how are you going to test the model?

Google, through its philanthropic endeavor, Google.org, does not have a very good track record for predicting the future. A few years ago, Google.org produced a future energy plan. To say that the google plan was not very good is an understatement.

Google.org thought that 1100 GWs of mainly renewable generating capacity would be sufficient to run the American economy. Google believes that 360 new GWs of wind generating capacity will be needed along with 250 gigawatts by 2030 of solar installation. The rest is going to come from Geothermal, hydroelectric, and not more than 30 new nuclear plants. But where are we going to get the 1100 GWs of generating capacity? First hydro is not going to provide us with much new electricity, most of the best hydro sites are already in use, and environmental organizations have stopped hydro expansion for over a generation. We already have about 350 GWs of hydro generation capacity. Yet that hydro capacity only produces 6% of the electricity generated in the United States. Hydro generation capacity should have signaled Google.org that use that it had a problem with its model.

No one at Google seems to have been aware of the problem of solar and wind indeterminacy. Solar power systems operate at 20% of their rated capacity in the desert southwest, and much less in the cloudy Southeast. Wind generators generate at best at a little more 40% of their rated capacity on the great planes. The electricity generated by renewables will not be reliable, and will not come simply if customers throw a light switch. Customers in New York City will have to wait until the wind picks up in Amarillo before they turn on the light. Making sure that you have renewable generated electricity when consumers actually want it is going to be hugely expensive. Google did not seem to have a clue.

So I wondered why Google did not see its mistake. Then I watched a video of Google's Chairman and CEO Eric Schmidt, talking about the Google energy plan:



Son of a gun, Eric Schmidt had been drinking the cool aid with the oracle of Snowmass, Amory Lovins. The Google energy plan relied a lot on efficiency to bridge gaps in renewable energy output. This was straight out of the gospel according to Amory Lovins, but not at all realistic. I am not an Amory Lovins fan. I am only one among a goodly numer of other reviewers have pointed to flaws in Mr. Lovins' thinking. In response to numerous criticisms, Amory Lovins appears to have abandoned his defense of his efficiency theories, as well as many of his other contentions. While Lovins has abandoned his defense of many of his energy related theories, he has not abandoned the theories themselves. One of Lovins pet theory is that nuclear power is too expensive. Eric Schmidt, however, still has faith in Lovins. And drinks the Kool air from cups marked "nuclear power is too expensive," and "efficiency will save us."

If Schmidt Googled nuclear cost he would have found that numerous reputable authorities disagree with his assumptions about nuclear costs. One way of measuring comparative energy costs, it to use the so called levelized cost measure. The International Energy Agency has found that the levelized cost of nuclear power will be lower than the levelized cost of onshore wind generated electricity, even before the cost of making wind reliable is factored in. The EIA views Offshore wind and all forms of solar as more expensive.

The American Energy Information Agency theorizes that the levelized cost of wind generated electricity without the cost of measures required to make it reliable is competitively with nuclear, but cannot be expected to be substantially lower. A report coming from the UK, and published by Parsons Brinckerhof estimated that the cost of onshore wind generated electricity would be the same as the cost of nuclear. A chart from Joe Romm reflects the reality of renewable nuclear and renewable costs:Note: Romm's Chart includes the subsidized cost of renewables, as well as their unsubsidized cost. Of course even with subsidies someone pays the difference between the subsidized and the unsubsidized cost.

Levelized costs reflect the cost of electricity as it leaves the generating facility, but not as it arrives at the consumer's business or home. If the electrical generation system is unreliable, some ways must be found to overcome that unreliability, and those ways usually cost money. The cost of making energy reliable will inevitably be passed on to the consumer. In the case of renewable energy this will include a system of back up generators, or redundant renewable generators, or energy storage. None of these come free, and the consumers will have to pay. Thus the cost of reliable renewable electricity is likely to be considerably higher than the levelized cost of electricity produced by renewable installations.

It has recently been argued that low cost Chinese manufactured back up systems will diminish the cost of making renewables reliable, but the cost of Chinese labor is rapidly rising and Chinese labor is far less efficient than American or Western European labor. As a consequence jobs have already started moving backs from China to the United States, and this trend will probably continue for some time to come. Thus the use of low cost labor in China, will not decrease the cost of renewable energy backup in the long run.

Renewables require higher material inputs than nuclear power, but currently have an advantage in labor input. However labor costs can be lowered by factory manufacture, but transportation will limit the size of factory manufactured reactors. Serial manufacture also lowers reactor costs.

Small, modular, factory manufactured reactors are becoming the rage. Traditionally power reactors have been built in the on site, so they have primarily been viewed as construction projects. But there are problems with large site based manufacturing projects. Reactors have to be built to precise standards. It is not enough that all the parts get assembled, they have to be assembled to exacting specifications. And if parts or their assembly do not meet specifications, they have to be redone. In is not enough to assemble teams of skilled laborers, they have to be trained on reactor specifications and how to meet them, and then the contractor has to make sure that they have the parts and materials that meet specifications.

Large reactors require a huge amount of labor, millions of work hours, to build. In a factory, the labor tasks that are preformed by skilled workers in the field assembly of large reactors, can be turned over to machines. The use of labor saving devices makes sense if you are going to build a lot of small reactors, so small factory built modular reactors are the way to go if you want to a lot of reactors in a hurry.

The advantage of large reactors is that as reactor energy output rises, materials and labor per unit of input falls. This lowers price. There are ways to counteract this problem. As we have already seen labor costs can fall if you substitute mechanical slaves for wage earning human workers. Thus the labor costs for factory built modular reactors will decline especially as the number of manufactured unit rises. Secondly, materials can be used more if the reactor is designed to be compact. Conventional nuclear technology requires large amounts of steel in the reactor core, in pressure vessels, heat exchanges, in steam turbines, in generators and in outer containment structures. Conventional nuclear power plant design also requires a lot of concrete.

Materials inputs into nuclear power plant can be controlled by compact design, simplicity, and by choice of nuclear technology. Increasing reactor operating temperature may increase the efficiency of materials use. Paradoxically, some low temperature reactors are materials hogs, while some high temperature nuclear technologies are very parsimonious with materials. Per F. Peterson, Haihua Zhao, and Robert Petroski of University of California note,
analysis presented here suggests that the ESBWR uses 73% of the steel, and 50% of the concrete required to construct an ABWR. This suggests that new Generation III+ nuclear power construction in the U.S. will have substantially lower capital costs than was found with Generation III LWRs.
Then they add that closed cycle gas turbines
technology that will be demonstrated by the Next Generation Nuclear Plant (NGNP) has the potential to achieve comparable material inputs to LWRs at much smaller unit capacities, and when extrapolated to larger reactors, to further reductions in steel and concrete inputs.
In particular the University of California researchers like Advanced High Temperature Reactor, molten salt cooled, compact reactors.
In nuclear energy systems, the major construction inputs are steel and concrete, which comprise over 95% of the total energy input into materials. To first order, the total building volume determines total concrete volume. The quantity of concrete also plays a very important role in deciding the plant overall cost:

• Concrete related material and construction cost is important in total cost (~25% of total plant cost for 1970’s PWRs [3]);
• Concrete volume affects construction time;
• Rebar (reinforcing steel in concrete) is a large percentage of total steel input (about 0.06 MTrebar per MT reinforced concrete for 1970’s PWRs [3]);
• Rebar is about 35% of total steel for 1970’s PWRs [3];
• Concrete volume affects decommissioning cost.
Not only reactors, but also generating turbines can be made compact. For example the super critical Carbon dioxide which are compatible with high temperature reactors will be extremely compact and highly efficient. V. Dostal, M.J. Driscoll, and P. Hejzlar of MIT state,
The thermal efficiency of the advanced design is close to 50% and the reactor system with the direct supercritical CO2 cycle is ~ 24% less expensive than the steam indirect cycle and 7% less expensive than a helium direct Brayton cycle. It is expected in the future that high temperature materials will become available and a high performance design with turbine inlet temperatures of 700oC will be possible. This high performance design achieves a thermal efficiency approaching 53%, which yields additional cost savings.

The turbomachinery is highly compact and achieves efficiencies of more than 90%. For the 600 MWth/246 MWe power plant the turbine body is 1.2 m in diameter and 0.55 m long, which translates into an extremely high power density of 395 MWe/m3. The compressors are even more compact as they operate close to the critical point where the density of the fluid is higher than in the turbine. The power conversion unit that houses these components and the generator is 18 m tall and 7.6 m in diameter. Its power density (MWe/m3) is about ~ 46% higher than that of the helium GT-MHR (Gas Turbine Modular Helium Reactor).
Simplicity can also lower reactor cost. Again high operating temperature and compactness are not necessarily enemies of simplicity in NPP design.

Small compact reactors will be easier than large reactors to deploy. In order to replace fossil fuels in a little over a generation, post-carbon energy technology must be capable of large scale deployment. The nuclear manufacturing system that has been developed over the last 50 years, in addition to requiring a large skilled labor input takes several years from the time the first shovel full of soil is moved, until the electrical generators are turned on. Thus it is extremely desirable to develop energy technology that can be deployed rapidly during the next 40 years.

The small reactor is drawing increasing attention. A recent report from the Organization for Economic Cooperation and Development titled "Current Status, Technical Feasibility and Economics of Small Nuclear Reactors," noted the potential of small reactors to be a game changer. Yet the latest Google modeling effort "Examining the Impact of Clean Energy Innovation on the United States Energy System and Economy," entirely ignores the possibilities opened up by small reactors and advanced nuclear technology.

Matt Hourihan, a Clean Energy Policy Analyst at the Information Technology and Innovation Foundation (ITIF) notes significant problems with the new Google report,
Of course, the big, obvious catch is that Google makes some fairly substantial assumptions about energy costs. Some of these are quite aggressive indeed. For example, under Google’s assumptions, onshore wind costs decline by more than 50 percent by 2050 – twice as much as the IEA has predicted. The assumptions for solar PV, CCS, and the other technologies are at least as aggressive – some would say unrealistic.
Despite these flaws, Hourihan sees some good things coming out of the Google Report,
But the efficacy of these assumptions are not the point of the report, nor does it mean the report doesn’t have value: it makes clear the enormous upside, economically and environmentally, of spurring breakthrough clean technologies -- so long as we get both the technology and the policy right. It’s not a question of either/or. Any efforts to mitigate emissions that don’t seek to accelerate energy innovation will likely end in failure, and miss an economic opportunity. Under Google’s model, neither the application of a $30 per ton carbon price nor a more robust set of policies and mandates to drive cleantech adoption reduced emissions as effectively on their own as when they were coupled with breakthrough innovations to drive cost declines. It’s a similar finding we published in a report a few months ago. And relying on these policies without also driving technology would lead to slower growth relative to the innovation approach. In terms of outcomes, the best policy mix thus appears to be one that incorporates an urgent push for radical technological innovation with a broad batch of policies.
This view is clearly consistent with the views I present on Nuclear Green. The Nuclear Green views are:
* Current renewable technology is too expensive
* Technological breakthroughs are unlikely to drive the cost of renewables down
* Large Light Water Reactors are and will be too expensive, as well as too limited to satisfy many energy needs
* There are technology, product manufacturing and product packaging routs that will drive the cost of advanced nuclear power to a cost that is significantly lower than the cost of either conventional renewables or conventional renewables.
* Small, low cost, advanced nuclear power plants can solve many post-carbon energy problems that are not solvable by solar, wind, or conventional nuclear technology.
* Developmental paths that are likely to produce low cost, advanced nuclear technology have been known for over a generation, but have been ignored.
We are not at a place yet that will allow us to agree on a technology, but the time is near at hand when society must agree on its energy goals, and start to set policy. We are not there yet, but the time for confusion is clearly over. We must begin to act soon.

Monday, December 21, 2009

Is Nuclear Power Too Risky to Afford?

Currently anti-nuclear ideologues are touting the line that nuclear power is too expensive. But too expensive in what ways? Nuclear critics have pointed to a report by Citigroup Global Markets on Nuclear Risk Factors. It states:
There are five substantial areas of risk faced by developers of new nuclear power stations. Three of those risk areas are so big and significant that if they go wrong, the developer (even the biggest utilities) could be financially damaged beyond repair. These risks can be classed as Corporate Killers. . .
Panning, that is the time and money that go into nuclear plans, into acquiring the nuclear site represents the first risk, because the plan might fall through, but
While annoying for the developers if this turns out to be wasted time and money, in no way would a failed planning application threaten the financial integrity of a utility company.
Similarly, a risk which the report calls "Decommissioning / Waste" is controllable if the right steps are taken. But Citigroup finds that this risk is also manageable through use of
a tax will be paid on each MWh produced (probably as little as £1/MWh). This would effectively limit the risk faced by the developers.
This leaves us with three serious risks. First is construction
Below we give the latest data on the current and future costs of building a new nuclear power station. The latest evidence suggests a cost range of €2,500/kW to €3,500/Kw. For a 1,600MW unit, that means a construction cost of up to €5.6bn. We see very little prospect of these costs falling and every likelihood of them rising further. The cost of the TVO plant in Finland has increased from €3.0bn to €5.3bn since construction started. It has also proven to be very difficult to predict how long a new plant will take to build. The TVO plant is also running three years late. Cost overruns and time slippages of even a fraction seen by TVO would be more than enough to destroy the equity value (and more) of a developer’s investment unless these costs can be passed through somehow. Given the scale of these costs, a construction programme that goes badly wrong could seriously damage the finances of even the largest utility companies.
The second risk factor which Citigroup sees as a problem is power price
Nuclear power stations have very high fixed costs and relatively low variable costs. Their cash flows and profitability are therefore particularly sensitive to the price that they sell their power. As we show later, even at the low end of the build cost estimates, we calculate that a new nuclear station will require €65/MWh (£58.5/MWh) in real terms year in/year out to hit its breakeven hurdle rate. . . . the UK has only seen prices at that level on a sustained basis for 20 months of the last 115 months. It was a sudden drop in power prices that drove British Energy to the brink of bankruptcy in 2003. No nuclear power station has ever been built to our knowledge where the developer takes the power price risk.
The final risk factor which Citigroup calculates is unexpected operational costs.
Because of their high fixed cost base, nuclear stations are also very vulnerable to shortfalls in output due to operational unreliability. A six-month breakdown can cost £100m’s in direct costs and lost output, particularly if the output has been pre-sold. This risk is too great for a single project to bear, in our view, and at the very least needs to be spread across a portfolio of assets.
There are, however, both shorter and longer range solutions to these Citigroup risks. The first and the third risks can be overcome by a government run insurance pool. Reactor constructors pay into the pool, which issues loan guarantees. Initially the guarantees would have to be backed by the government, but as the pool builds up, it would be able to pay off losses either on construction or prolonged operational shutdowns. The rational for this is simple. Just as wind and solar, which are fare more dubious AGW mitigation approaches, have investor risks lowered by substantial government subsidies, the risks entailed by nuclear investments can and should overcome controlled by government action as well. Loan guarantees are a low cost means by which the Government can mitigate the risk of nuclear investors.

A loan insurance pool is a short run means of controlling the loan related risks of nuclear constructors. Longer run means would involve a number of changes in the way reactors are built, and by the introduction of a radical new nuclear technology, that involves a complete redesign of the reactor. As for the price risk, this is a puzzling point, because all alternatives to nuclear power, either carry unacceptable carbon related problems that present even bigger risks to potential investors, political risks or actually will cost more, and lead to even higher electrical costs than would be the case with nuclear power. It seems unlikely than any of the acceptable electrical generation options from the carbon emissions perspective will cost less than nuclear generated electricity.

From a slightly longer range perspective, the small reactor approach will offer substantial relief quite aside from the loan guarantee insurance pool. In a recent Toronto Star column Tyler Hamilton pointed to small reactors as a potential solution to the loan risk problems of nuclear financing. Tyler quotes American Nuclear Society President, Tom Sanders, who argued that small reactors would do for reactors
what Henry Ford did for cars
Hamilton commented:
The result is that economies of scale are replaced by economies of volume that come from assembly line manufacturing.
Factory built reactors could be shipped in large componants by truck, rail or barge, and assembled on reactor construction sites, with what Hamilton calls a,
Lego block approach.
Other cost saving ideas include building
them in a factory setting using robotic assembly, . . . The reactors would be low maintenance, have passive safety features, and would be buried underground.
Hamilton did not mention recycling old coal fired power plant sites, an approach that could save tens or even hundreds of millions of dollars in side development costs. I have been told that Babcock & Wilcox, the only surviving American Owned reactor manufacture plans to to use all of these money saving approaches. B&W plans to cluster small reactors, rather than to build big reactors. Reactor owners could add more reactors to the cluster as electrical demand increases.

Small reactors would cost proportionately less than large reactors, and thus their financing is not a "bet the farm" proposition. A cluster of small reactors can be purchased one at a time, as it the purchase of each becomes easily affordable. There is a hidden economic advantage to the small reactor - coal yard approach. Grid expansion costs, often associated with the construction of large reactors can be avoided. The construction of new high tension power lines, need to reach electrical customers from some new large reactor projects, and large scale renewables projects, can cost up to $3 billion dollars. Coal fired power plants already have grid hookups available. All you have to do is swap out generation sources.

The small reactor cluster also is an effective counter to the the operational risk problem. If one reactor goes down for a prolong period of time, there would still be a stream of income from the other reactors in the cluster.

The electrical cost problem, identified by Citigroup is a different issue. Both the Energy Information Agency projections and the SCANA projections show that the long term projected costs for nuclear power, although high, is lower than their cost projections for renewables.

PV advocates bitterly object to this to the high estimates of PV cost, and insist that the cost of PV panels is going to rapidly sink to virtually nothing for vast amounts of power. Solar advocates have been telling us similar stories since the 1970's, and PV is still outrageously expensive. The PV industry is highly dependent on subsidies for their living, but the need the sky high costs are falling stories to justify more subsidies.

In a some what longer term more advanced nuclear technology, holds the potential to bring nuclear costs down and lower the cost of electricity. The lure of lower electrical costs, should be enough to lure the advanced industrial states of North America, Eastern Asia, and Europe into investing in advanced nuclear R&W. I have repeatedly argued that a form of advanced nuclear technology that uses fuel dissolved in liquid salts holds the key to lowering nuclear costs. Policy makers should be highly motivated to uncover and sponsor research into such promising options, but as David Walters recently observed in a comment on Nuclear Green,
What is common about countries really engaged in nuclear energy deployment is the goals they really set for themselves: S. Korea, China and India. I expect Vietnam as well. These projects become points of national pride.
The failure to develop promising nuclear technologies, which potentially hold the key to lowering energy costs, in the face of of an unprecedented global energy crisis is a matter of national shame. It is utterly shameful than the American Energy Secretary, a Nobel Prize winning physicist, is so poorly informed about this option. Unfortunately the United States and Western Europe face the current energy crisis without a since of national pride. We will pay a high cost for this failure to take pride in ourselves, for this failure to believe in ourselves, and the high cost of electricity will be the least of the costs we pay.

Followers

Blog Archive

Some neat videos

Nuclear Advocacy Webring
Ring Owner: Nuclear is Our Future Site: Nuclear is Our Future
Free Site Ring from Bravenet Free Site Ring from Bravenet Free Site Ring from Bravenet Free Site Ring from Bravenet Free Site Ring from Bravenet
Get Your Free Web Ring
by Bravenet.com
Dr. Joe Bonometti speaking on thorium/LFTR technology at Georgia Tech David LeBlanc on LFTR/MSR technology Robert Hargraves on AIM High